We will be undertaking drainage works to improve the stormwater system, reduce the risk of flooding and improve the existing trapped low point in Barrands Lane, Drysdale.
We will be undertaking the following work in Barrands Lane
and Wyndham Street:
- Installing
new drainage pipes to convey stormwater to the existing pipe in Wyndham
Street
- Installing
new collection pits and upgrading some existing side entry pits from
singles to doubles
The tender process commenced in late 2023 and a contractor is expected to be appointed soon. Construction is still expected to be completed by 30 June 2024.
Disruptions are expected during the construction phase of
the project:
- In
Barrands Lane, there may be part road closures and limited access to
through traffic at different times. Access to properties will be
maintained where possible for residents.
- In
Wyndham Street, there may be part road closures at different times. Access
to through traffic will be maintained where possible however drivers may experience short
waiting times. Access to properties will be maintained where possible for residents.
- Traffic
control will be necessary and drivers may experience short waiting times –
residents may wish to consider alternate routes.
Emergency services and public transport operators needs will be addressed.
Project updates will be available on this webpage. We will
contact residents directly as needed.
If you have any queries, please contact the Engineering
Services team on 5272 5272 or email [email protected]