Framework Plan – what is the status of technical reports?

A number of technical reports informed the preparation of the Framework Plan. These are listed in the References section on page 251 of the document.

The technical reports generally contain more detailed information than the resulting content of the Framework Plan; this is appropriate as the Framework Plan provides high level strategic land use and development actions for each growth area that need to be investigated in more detail and confirmed as part of the preparation of each subsequent precinct structure plan (PSP).

Preparation of PSPs will include further technical reports on individual precincts to refine and provide more detailed guidance on land use, subdivision and infrastructure for each property in the growth areas. Each PSP takes approximately three years to prepare and landowners will be informed and engaged throughout the preparation of the PSP that their property is located within.




Page last updated: Thursday, 27 June 2019