Bellarine Rail Trail

The Bellarine Rail Trail is a 35 kilometre trail that links South Geelong to Queenscliff following the alignment of the historical Geelong - Queenscliff Railway Line.
 

Two girls cycling on the rail trail as a steam train travels along the tracks to their left; all travelling towards the camera 
The Bellarine Rail Trail provides an inspiring passage to the many tourist attractions across the Bellarine Peninsula.

The trail is primarily constructed of compacted, crushed rock and provides a high quality surface suitable for all bikes other than those fitted with racing tyres.


Map showing the rail trail from Queenscliff through to South Geelong 


Sections of the trail between the South Geelong Railway Station and the Bellarine Highway, and Melaluka Road and Curlewis Road are sealed to provide a quality surface in high traffic areas.
 
The surrounding reserve features areas of remnant, indigenous vegetation, creating a safe and tranquil environment for users.

Starting at the South Geelong Station, the trail moves through the eastern suburbs of Geelong and onto the Bellarine Peninsula through Leopold and Drysdale, terminating at the Queenscliff Railway Station.

Christies Road, Leopold is a popular stepping off point with toilets, shelter and drinking fountain - as is Drysdale Railway Station.

Suma Park has a shelter and toilets making it a welcome resting spot during the return climb from Queenscliff.

There is another shelter where the trail crosses Swan Bay Road at Mannerim.

Emergency and distance markers are installed at kilometre intervals along the trail.

The trail is popular with weekend recreational cyclists as the 35km length one way makes for a decent ride with the added bonus of excellent views of the surrounding farmland and coast.

The gradient is mostly easy and flat with a gradual climb in some places. Families with young children often choose to avoid the return uphill climb from Queenscliff to Mannerim by either hopping on the steam train or arranging other transport.

Revegetation and maintenance works continue on an ongoing basis.


Page last updated: Friday, 3 March 2017
Print